FIELD WORKSHEET / 01
Site access pre-survey checklist
Use this worksheet to organize the information needed for an early route review. It is a planning aid—not an engineering approval, lift plan, or permit determination.
- 01Record the building address, delivery contact, property owner, and general contractor.
- 02Confirm the safe or vault make, model, delivery configuration, and intended final location.
- 03Obtain documented equipment weight and dimensions; mark any unverified value as unknown.
- 04Measure clear doorway width and height, including door swing and hardware.
- 05Record corridor widths, turning space, overhead clearance, thresholds, slopes, and floor transitions.
- 06For an elevator route, note the posted limit, car and door dimensions, sill, approach, and reservation rules.
- 07For a stair route, document widths, landings, turns, headroom, and available building records.
- 08Request floor, stair, and final-location information from the owner or structural professional.
- 09Identify loading-zone, vehicle, staging, sidewalk, street, and overhead utility constraints.
- 10Confirm building access hours, tenant coordination, security rules, elevator protection, and delivery windows.
- 11Assign ownership for landlord, jurisdiction, permit, traffic-control, and structural approvals.
- 12List unresolved assumptions, the person responsible for each answer, and the date to reconfirm the route.
