Heavy rigging and controlled placement
Handling methods are selected around verified load, geometry, lift points, access, and final set location.
- Load and lift-point review
- Lift method planning
- Controlled set and positioning
Field operations / 02
Controlled movement.
Rigging, protection and placement planned as one site-specific scope, for equipment up to 6,000 lb per piece.
Sequence depends on verified equipment, access, floor loading, and site conditions.
Field scope / 03
SITE CONDITIONS FIRSTHandling methods are selected around verified load, geometry, lift points, access, and final set location.
Temporary support and load transfer are reviewed against building conditions and equipment travel paths.
Floor and finish protection is planned for vulnerable surfaces before equipment enters the site.
Move coordination aligns site access, delivery windows, routing, and operating activity on location.
Our limit is 6,000 lb per piece.
The survey findings and the plan: the route, the handling approach, the floor protection and the final position, agreed before we schedule.
Field planning
Share the equipment, location, known route constraints, and operating windows to begin a handling review. Riggers can also use the free rigging use and inspection log to keep gear records.